Image courtesy www.smh.com.au
| System ID: | jl-0ac6283a90c5bda87b57e38a6efeb13e |
|---|---|
| Title: | Zenith fills in blanks on 600m WA gold corridor |
| Link: | Original article on www.smh.com.au |
| Region: | AU |
| Topics: | fills; blanks; dulcie; resource; wa; 600m; results; central; company; project; gold; corridor; gift; drilling; zenith |
| Datetime: | |
| Summary: | AdvertisementSponsored BusinessCompaniesBulls N' Bears Zenith fills in blanks on 600m WA gold corridor Brought to you by BULLS N’ BEARS Murray Ward October 27, 2026 — 12:39pm Save You have reached your maximum number of saved items. Gift icon Gift Gift icon 0 / 3 No gift articles left You've used all of your gift articles. The drilling at Dulcie Central was designed to test a 600-metre gap between the company’s existing Dulcie North and Dulcie deposits. Forrestania is looking to fold Zenith’s gold assets into its broader WA hub-and-spoke strategy, centred on its Edna May and Lake Johnston operations, potentially providing a development pathway for the growing Dulcie gold inventory. Gift icon Gift Gift icon 0 / 3 No gift articles left You've used all of your gift articles.... |